The production process of lead oxide equipment is a new process of Barton furnace continuous melting powder making granulation moving bed deep oxidation and rapid cooling.
The use of mobile bed calcination and mobile bed rapid process results in solid particles moving continuously downwards in a dense state, avoiding material collision and severe friction, thus resulting in a low crushing rate;
The moving bed reactor has large thermal inertia and small temperature fluctuations, fully meeting the reaction temperature requirements;
The material stays in the moving bed for a long time and the residence time distribution is relatively uniform, which can ensure a longer reaction time required;
The reverse heat exchange between materials and hot flue gas can control the exhaust temperature, efficiently utilize thermal energy, and have a simple system;
The material gradually moves from low temperature to high temperature and then to low temperature in the bed, eliminating the generation of lead vapor.
Compared with the electric furnace method, the energy consumption of this process is only 30% of the original process, and the energy cost is only 20% of the original process.